| Our Role in the Project | Main Contractor |
| Nature of the Project | Building Works |
| Location of the Project | Nairobi County, Kenya |
| Client | Bank Of India |
| Project’s Lead Consultant | Design Bureau |
| Project’s Architect | Design Bureau |
| Contract Sum (2002) | KES 40,377,995.00 |
| Contract Sum Adjusted for Inflation (2019) | KES 201,350,000.00 |
| Project Status/Duration | 45 Weeks (2002 To 2003) |
| Scope | - 2 blocks of three stories each
- Each Flat had its own intercom
- Satellite dish
- Solar water heating system
- Rain water harvesting system
|